Pershore infrastructure improvement scheme

Pershore infrastructure improvement scheme

Information on the scheme to upgrade the links between Pershore town centre and the A44.

There were a number of transport issues just outside Pershore which were causing poor journey time reliability and congestion. The A44 was not performing to its intended capacity and knock on effects had further impacts on the road network as a whole. For example:

  • increasing congestion along Station Road and use of Station Road by heavy goods vehicles accessing Keytec Business Park
  • the B4084 remains busy as people are choosing to drive through Pershore to avoid delays at Pinvin

The South Worcestershire Development Plan (SWDP) recognised that high levels of development were need to be supported by improvements to the road network to support increased traffic flows..

The proposal

To tackle these issues, a number of works were proposed to upgrade the links between Pershore town centre and the A44. This comprised of three key scheme elements:

  • The construction of a Northern Link Road
  •  Enhancement to the A44 Pinvin Crossroads
  • Improvements to signalisation of A4104 Station Road and B4083 Wyre Road junction
     
    • This signalised junction was constructed by Persimmon Homes to enable a safe and easier passage for vehicles and pedestrians. 
      To read more about the Persimmon Homes work on the junction, please download Persimmon Homes Public Exhibition leaflet.

Engagement

Public engagement sessions were held during November and December of 2017 and an Engagement Report was produced which details the feedback received and the proposed recommendations following the feedback.

Download the Pershore Infrastructure Scheme Engagement report February 2018

Contact

If you would like any further information please email: majorprojects@worcestershire.gov.uk.

Completion

The Pershore Northern Link Road was opened in September 2022.

Scheme maps

Above is the map showing where the works on the Pershore Infrastructure Improvements Scheme will take place. Scheme one is to build the Pershore Northern Link Road, scheme two is making enhancements to Pinvin Junction and scheme three is making improvements to the Station Road and Wyre Road Junction.

Please be aware that these documents are very detailed and may not be accessible to all. If you require any further assistance with these, please get in touch via majorprojects@worcestershire.gov.uk

Pershore Northern Link Road

Link Road and Wyre Road roundabout

This map shows the proposed layout of the new junction where the new Link Road meets the Wyre Road roundabout. Works here include a new crossing facility.

Download: Link Road and Wyre Road roundabout (PDF)

Link Road and A44 roundabout

This map shows the proposed layout of the new junction where the new Link Road meets the A44/B4083 roundabout. Works here include a new crossing facility.

Download: Link Road and A44 roundabout (PDF)

Link Road Carriageway

This map is split into two. The top section of the map shows the proposed layout of the road on the approach to the new Link Road junction with the Wyre Road roundabout. The bottom of the map shows the proposed road layout on the approach to the new Link Road junction with the A44/B4083 roundabout.

Download: Link Road Carriageway (PDF)

Pinvin Junction

This map shows the overall improvements that have taken place at Pinvin Junction. Works here included the introduction of a new link road between the A44 and Main Street, widened footways and widened approaches to the junction to improve traffic capacity. Main Street was also realigned to create a crossroads.

Download: Pinvin Junction (PDF)

Wyre Road East

This map shows the section of Wyre Road from its junction with the A4104. The map highlights the works to install the new cycle/footway and other changes to the kerb line and signage. The map is split into two. The top half shows the work taking place from the A4104 junction and joins into the map on the bottom, showing the work being carried out of the westerly side of Wyre Road.

Download: Wyre Road East (PDF)

Wyre Road Central

This map carries along Wyre Road, showing the works taking place in the middle section of the road. The map is split into two, showing two separate sections of the road. The map highlights the works to install the new cycle/footway and other changes to the kerb line and signage.

Download: Wyre Road Central (PDF)

Wyre Road West

This map carries along Wyre Road, detailing work up to the roundabout. The map is split into two. The map highlights the works to install the new cycle/footway and other changes to the kerb line and signage.

Download: Wyre Road West (PDF)

Was this page useful?